All Information
Company Name:
Clark Construction Group, LLC
Bid Title:
Poplar Pumping Station, Washington, DC
Bid Due Date:
9/24/14
Bid Due Date Time:
2:00 PM
Project Description:
Division Z - Poplar Point Pumping Station Replacement and Main Outfall Sewers Diversion. Division Z has been developed to provide all work to accomplish the following:
Construct a new 55 MGD Popular Point Pumping Station Replacement (PP-PS)
Divert flow from the existing Anacostia Main Interceptor (AMI) via proposed AMI Diversion Chamber (AMI-DC) and direct diverted flow through the proposed AMI Diversion Sewer (AM-DS) to the Emergency Overflow Structure (EOS)
Convey dry weather flows from the EOS to the newly constructed PP-PS where the flow will be lifted and conveyed via a 42" diameter pressure conveyance pipe (force main) to the location of discharge into the gravity sewer system at the proposed Discharge Connection Chamber (DCC)
Provide conveyance of sewage from the sewer collection system located in Barry Road to the EOS via the Barry Road Sewer Extension (BRSE)
Provide wet weather overflow from the EOS to the Poplar Point Junction Shaft (PP-JS) and the underlying Blue Plains Tunnel (BPT)
Provide a wet weather overflow from the Main Outfall Sewers (MOS) through the proposed MOS Diversion Chamber (MOS-DC) to the BPT via an approach channel and a vortex drop structure currently under construction in Division A
Work includes:
Construct a new 55 MGD Popular Point Pumping Station Replacement (PP-PS)
Divert flow from the existing Anacostia Main Interceptor (AMI) via proposed AMI Diversion Chamber (AMI-DC) and direct diverted flow through the proposed AMI Diversion Sewer (AM-DS) to the Emergency Overflow Structure (EOS)
Convey dry weather flows from the EOS to the newly constructed PP-PS where the flow will be lifted and conveyed via a 42" diameter pressure conveyance pipe (force main) to the location of discharge into the gravity sewer system at the proposed Discharge Connection Chamber (DCC)
Provide conveyance of sewage from the sewer collection system located in Barry Road to the EOS via the Barry Road Sewer Extension (BRSE)
Provide wet weather overflow from the EOS to the Poplar Point Junction Shaft (PP-JS) and the underlying Blue Plains Tunnel (BPT)
Provide a wet weather overflow from the Main Outfall Sewers (MOS) through the proposed MOS Diversion Chamber (MOS-DC) to the BPT via an approach channel and a vortex drop structure currently under construction in Division A
Work includes:
- Trenchless and Open-Cut Sewer Installation
- Sewer Hydraulic Structures
- Support of Excavation (SOE)
- Pumping Station (Submersible Dry-Pit Pumps)
- Main Outfall Sewer Diversion Chamber
- Site Grading and Drainage
- Maintenance of Existing Sewer Flows
Posted On:
2014-09-12 11:19:35
Contact Information
Name:
Clark Construction Group, LLC
Phone Number:
301-272-8100
Fax Number:
301-272-7449
Forms And Attachments