All Information
Company Name:
Clark Construction Group, LLC
Bid Title:
BWI International Baggage Glen Burnie, MD 21061
Bid Due Date:
12/12/14
Bid Due Date Time:
2:00 PM
Project Description:
Improvements and installation of a new checked baggage inspection system at the BWI international pier.
Provide all labor, materials, equipment, tools, and incidentals needed for the installation of a new Checked Baggage Inspection System (CBIS) in the International Pier at BWI-Marshall, including (but not limited to):
a. New Baggage Handling System (BHS), including conveyor bed sections, drives, high-speed horizontal diverters/power faced diverters, automatic tag reader, sideguards, floor supports, ceiling hangers and headers, conveyor trim, software, computer and network equipment, electrical equipment and materials, catwalks, platforms and access ladders.
b. Checked Baggage Resolution Area (CBRA), On-Screen Resolution (OSR) room, Baggage Control Room, and associated Server and Equipment Rooms; with associated mechanical, electrical, and fire suppression equipment; and finishes
c. A new rooftop mechanical unit and associated steel framing.
d. Interior partitions consisting of metal studs and gypsum wallboard, doors and hardware, interior finishes including resilient flooring and base; paint, and acoustic ceiling panels.
e. Modifications to the fire suppression system.
f. Miscellaneous plumbing modifications.
g. HVAC including hydronic piping, valves and pumps; metal ducts; diffusers, registers and grilles.
h. Electrical including lighting, panelboards, low-voltage transformers, wiring devices; fuses; enclosed switches and circuit breakers; enclosed controllers; variable frequency motor controllers; lightning protection; fire alarm
i. Communications (non-proprietary components)
j. Various building work associated with the items listed above, including new concrete topping slab, and overhead coiling door.
k. Selective demolition of existing building components and systems associated with the above listed work.
Provide all labor, materials, equipment, tools, and incidentals needed for the installation of a new Checked Baggage Inspection System (CBIS) in the International Pier at BWI-Marshall, including (but not limited to):
a. New Baggage Handling System (BHS), including conveyor bed sections, drives, high-speed horizontal diverters/power faced diverters, automatic tag reader, sideguards, floor supports, ceiling hangers and headers, conveyor trim, software, computer and network equipment, electrical equipment and materials, catwalks, platforms and access ladders.
b. Checked Baggage Resolution Area (CBRA), On-Screen Resolution (OSR) room, Baggage Control Room, and associated Server and Equipment Rooms; with associated mechanical, electrical, and fire suppression equipment; and finishes
c. A new rooftop mechanical unit and associated steel framing.
d. Interior partitions consisting of metal studs and gypsum wallboard, doors and hardware, interior finishes including resilient flooring and base; paint, and acoustic ceiling panels.
e. Modifications to the fire suppression system.
f. Miscellaneous plumbing modifications.
g. HVAC including hydronic piping, valves and pumps; metal ducts; diffusers, registers and grilles.
h. Electrical including lighting, panelboards, low-voltage transformers, wiring devices; fuses; enclosed switches and circuit breakers; enclosed controllers; variable frequency motor controllers; lightning protection; fire alarm
i. Communications (non-proprietary components)
j. Various building work associated with the items listed above, including new concrete topping slab, and overhead coiling door.
k. Selective demolition of existing building components and systems associated with the above listed work.
Posted On:
2014-11-21 17:32:05
Contact Information
Name:
Clark Construction Group, LLC
Phone Number:
301-272-8100
Fax Number:
301-272-1922
Forms And Attachments