Building J is a two-story, 42,000 square-foot brick building with a basement that was constructed in 2000. The project will relocate critical administration and laboratory functions from Building J to Buildings G/1 and G/2. Work includes, but is not limited to the demolition of Building J, and provision of a new chilled water plant, one new laboratory (approximately 5,000 square feet), new locker rooms (approximately 3,250 square feet), new fiber optic room, new server and electrical rooms, new roof, new break, training and control rooms, and a three-level stair tower.
Divisions of work include:
Division 2- Demolition, Earthwork, Paving, Landscaping
Division 3- Cast-in-Place Concrete
Division 4- Masonry
Division 5- Miscellaneous Metals & Structural Steel
Division 7- Roofing, Fireproofing, Firestopping, Joint Sealants
Division 8- Doors & Hardware, Overhead Doors, Aluminum Storefronts & Windows
Division 9- Gypsum Board & Acoustical Ceilings, Tiling & Resilient Flooring, Carpeting, Painting
Division 10- Casework, Lockers
Division 15-Process Mechanical, Plumbing, HVAC, Fire Suppression System
Division 16- Electrical, Instrumentation & Control
Please call Jeff Carr at 301-490-9100 for more information if you are interested in bidding any portion of the work. We will provide the contract documents and/or we will schedule a time to meet with you upon request.