Grunley Construction Company, Inc.
Bid Title:
PEB 4th Floor Fit-out & Infrastructure Upgrades
Bid Due Date:
12/11/2020
Bid Due Date Time:
4:00 PM
Project Description:
Project Address: SSA National Computing Center | Woodlawn, MD
Estimated Value: $30-50M
Project Duration: 550 Calendar Days
Subcontractor Due Date: 12/11/2020 @ 12:00 PM
Project Description:
PEB 4th Floor Fit-out & Infrastructure Upgrades
The project scope consists of approximately 90,000 SF of renovations, tenant improvements on the 4th floor, two new exterior stair tower structures for egress out of the PEB on levels 1-5, smoke evacuation system upgrades for the PEB lobby, and may include new HVAC equipment on each of the existing 5 floors complete with building automation controls, upgrading existing BAS controls at the PEB and PEUB Building. As part of the demolition, identified hazardous material removal is expected, including asbestos containing materials and lead based paint.
PEB Cafeteria Expansion
If you have questions regarding this bid, please contact one of the following estimators:
Alex McWhirter – (Divisions 2, 3, 31 & 33)
alexmcwhirter@grunley.com
Andrew Hamlin - (Divisions 4, 5, 7)
andrewhamlin@grunley.com
Jamie Sammons - (Divisions 6, Terrazzo, Access Flooring, 12, 32)
jamiesammons@grunley.com
Ryan Garland - (Divisions 8, Drywall & Painting)
ryangarland@grunley.com
Monica Pineau - (Flooring, Tile, Divisions 10?11)
monicapineau@grunley.com
Tyler Miller - (Divisions 21?28)
tylermiller@grunley.com
Estimated Value: $30-50M
Project Duration: 550 Calendar Days
Subcontractor Due Date: 12/11/2020 @ 12:00 PM
Project Description:
PEB 4th Floor Fit-out & Infrastructure Upgrades
The project scope consists of approximately 90,000 SF of renovations, tenant improvements on the 4th floor, two new exterior stair tower structures for egress out of the PEB on levels 1-5, smoke evacuation system upgrades for the PEB lobby, and may include new HVAC equipment on each of the existing 5 floors complete with building automation controls, upgrading existing BAS controls at the PEB and PEUB Building. As part of the demolition, identified hazardous material removal is expected, including asbestos containing materials and lead based paint.
PEB Cafeteria Expansion
The project scope consists of approximately 4,800 SF of renovations to the building commercial kitchen, the serving area, expansion into an existing storage room, and limited site improvements associated with the replacement/relocation of two exterior doors. Project includes the construction of temporary and limited pre-packaged food service in the existing dining area. All new equipment, kitchen equipment, finishes, signage and building infrastructure is included as indicated in the Construction Documents. As part of the demolition, identified hazardous material removal is included, including asbestos containing materials and mercury-containing light fixtures. FF&E is not included.
Grunley has established a policy to increase the participation of Small Businesses, including Small Disadvantaged Businesses, Women-Owned Small Businesses, Historically Underutilized Business Zone Small Businesses, Veteran-Owned Small Businesses and Service-Disabled Veteran-Owned Small Businesses on all our projects.
Grunley encourages Small Businesses to provide bids on the SSA PEB 4th Floor Fit Out & Infrastructure Upgrades project. A Size Self-Certification is included with the RFP documents and should be filled out and returned prior to bid day.
If you have questions regarding this bid, please contact one of the following estimators:
Alex McWhirter – (Divisions 2, 3, 31 & 33)
alexmcwhirter@grunley.com
Andrew Hamlin - (Divisions 4, 5, 7)
andrewhamlin@grunley.com
Jamie Sammons - (Divisions 6, Terrazzo, Access Flooring, 12, 32)
jamiesammons@grunley.com
Ryan Garland - (Divisions 8, Drywall & Painting)
ryangarland@grunley.com
Monica Pineau - (Flooring, Tile, Divisions 10?11)
monicapineau@grunley.com
Tyler Miller - (Divisions 21?28)
tylermiller@grunley.com
Posted On:
2020-11-30 07:34:46
Contact Information
No Contact yet
Forms And Attachments