George, Miles & Buhr, LLC
Bid Title:
TYLERTON-RHODES POINT SUBAQUEOUS FORCE MAIN Smith Island Clean Water Project (SICWP)
Pre Bid Meeting Date:
10/27/2021
Pre Bid Meeting Start Time:
9:00 AM
Bid Due Date:
11/10/2021
Bid Due Date Time:
2:00 PM
Project Description:
Sealed bids for the installation of the TYLERTON-RHODES POINT SUBAQUEOUS FORCE MAIN Smith Island Clean Water Project (SICWP) will be received by Somerset County Sanitary District, Inc., at the Princess Anne Wastewater Treatment Plant office located at 30353 Linden Avenue, Princess Anne, Maryland 21853 until 2:00 PM local time on Wednesday, November 10, 2021, at which time the Bids received will be publicly opened and read aloud.
Work consists of installation of a 4-inch HDPE SDR7 subaqueous pipeline from the Tylerton Pump Station for approximately 5,100 linear feet to a discharge manhole on Marsh Road in Rhodes Point. The project involves two (2) horizontal directional drills with lengths of approximately 600 feet and 725 feet with open water transition connections. The remaining pipeline installation to be in open water with buried pipe installed by hydraulic jetting technology referenced in the wetlands license. Smith Island is in the Chesapeake Bay approximately thirteen (13) miles from the Crisfield Depot. All work included in the contract drawings and included in the contract specifications to be included in the lump sum prices bid.
A pre-bid conference will be held at the project site on Wednesday, October 27, 2021, departing by boat from the Crisfield, MD Dock at 9:00 AM local time to allow Contractors an opportunity to obtain information on the project from the Consulting Engineer and the Owner. Transportation to the site will be provided by the Owner. Attendance at the pre-bid conference is not mandatory.
See attachment below for complete bid details.
Work consists of installation of a 4-inch HDPE SDR7 subaqueous pipeline from the Tylerton Pump Station for approximately 5,100 linear feet to a discharge manhole on Marsh Road in Rhodes Point. The project involves two (2) horizontal directional drills with lengths of approximately 600 feet and 725 feet with open water transition connections. The remaining pipeline installation to be in open water with buried pipe installed by hydraulic jetting technology referenced in the wetlands license. Smith Island is in the Chesapeake Bay approximately thirteen (13) miles from the Crisfield Depot. All work included in the contract drawings and included in the contract specifications to be included in the lump sum prices bid.
A pre-bid conference will be held at the project site on Wednesday, October 27, 2021, departing by boat from the Crisfield, MD Dock at 9:00 AM local time to allow Contractors an opportunity to obtain information on the project from the Consulting Engineer and the Owner. Transportation to the site will be provided by the Owner. Attendance at the pre-bid conference is not mandatory.
See attachment below for complete bid details.
Posted On:
2021-09-29 13:23:08
Notes:
Any Contractor having questions concerning the bid should submit them in writing via email to the Issuing Office at mhall@gmbnet.com no later than 2:00 PM, on Friday, October 29, 2021. Questions shall include the project name (SUBAQUEOUS FORCE MAIN – SICWP) in the subject heading.