
All Information
Company Name:
Clark Construction Group, LLC
Bid Title:
DC Water and Sewer Authority Piney Branch Tunnel Washington, DC
Bid Due Date:
04/10/2025
Bid Due Date Time:
2:00 PM
Project Description:
DC Water’s Clean Rivers Project is planning a 4.2-million-gallon underground storage tunnel to capture sewage combined with stormwater, known as combined sewer overflow (CSO), that would otherwise overflow into Piney Branch and ultimately Rock Creek during heavy rains. This project will reduce overflow volume from CSO 049 by 96% in an average year when completed.
Requested Scopes of Work include (but are not limited to):
Temporary Facilities Supply, Job Site Photos, Field Engineering, Permit Coordinator, Community Outreach Coordinator, Environmental Manager, Maintenance of traffic, Fencing, Erosion & Sediment Control, Tree Removal, Aggregate Supply, Trucking & Hauling, Asphalt Paving, Curb & Gutter, Reinforced Concrete pipe supply, Precast storm Drain Manholes, Landscaping, Temporary Seeding, Earthwork, Site Utilities, Temporary Electrical Installation, Security, Noise and Pollution Control Consulting.
Posted On:
2025-03-24 16:21:56
Contact Information
Name:
Stephanie Jones
Phone Number:
240-672-4047
Email Address:
stephanie.jones@clarkconstruction.com
Forms And Attachments
Attachments
