Bid Title:
St. Clements Shores Wastewater Treatment Plant Enhanced Nutrient Removal Upgrade
Pre Bid Meeting Date:
06/10/2025
Pre Bid Meeting Start Time:
10:00 AM
Bid Due Date:
07/08/2025
Bid Due Date Time:
2:00 PM
Project Description:
The work in general is for the upgrade and expansion of the existing St. Clements Shores Wastewater Treatment Plant to enhanced nutrient removal (ENR) for a capacity of 160,000 gallons per day (gpd) average daily flow (adf). Work includes, but is not limited to: an MBR headworks system; post-tensioned concrete bioreactor tank; RAS flow splitter; post-tensioned concrete post-anoxic and MBR tank; building to house permeate pumps, valving, electrical equipment, chemical equipment, laboratory, etc.; exterior chemical storage tanks; backpulse tank; spray field control valves; lagoon embankment repair; lagoon dredging; site access road; various site improvements; new generator at the existing control building; demolition of existing plant components necessary for the construction of the plant upgrades; and connection to existing facilities. Close coordination with wastewater plant personnel will be required for the duration of this project, especially for any activities related to any demolition or connections to existing facilities.
Posted On:
2025-05-28 11:57:59
Contact Information
No Contact yet
Forms And Attachments
Attachments