Clark Construction Group, LLC is soliciting proposals from MBE/WBE subcontractors and suppliers for:
The Upper Occoquan Service Authority project includes the construction of a new ozone biofiltration treatment system at the Millard H. Robbins Jr. Regional Water Reclamation Plant (RWRP). The work includes, but is not limited to, selective demolition of existing facilities at the filter building L/2, construction of a new ozone generation facility, new liquid oxygen storage facilities, an ozone contractor at building L/2, improvements to the intermediate pump station, electrical/controls, and site work/restoration in accordance with the contract documents.
Scopes of work include, but are not limited to:
Dewatering, Trench Excavation, Backfill, Excavation Support and Protection, Underground Piping, Temporary Bypass Pumping Systems, Removal of Asbestos-Containing Materials, Cast-In-Place Concrete, Concrete reinforcement, Crack Repair, Scaling/Spall Repair, Structural Steel, Miscellaneous Metals, Painting, Identification Devices, Process Equipment supply, Pipe Hangers and Supports, Pipes, Valves, Fittings and Specialties, Electrical, Instrumentation, Material Hauling and Disposal.
INFORMATION ABOUT PLANS AND SPECIFICATIONS
Drawings, Specifications, and Scope Information May Be Obtained From:
Stephanie Jones | stephanie.jones@clarkconstruction.com | 240-672-4047
Bid documents can be viewed: Online at our BuildingConnectedTM website as of October 31st, 2023
CLARK IS AN EQUAL OPPORTUNITY EMPLOYER
We request bids from small, disadvantaged, minority and Women-owned subcontractors and suppliers.










