Work includes mobilization; clearing and grubbing; demolition if required; cured-in-place pipe (CIPP) pipe lining of approximately 2,360 LF of 8-inch through 24-inch sewer; cured-in-place pipe (CIPP) pipe lining of approximately 6,050 LF of 36-inch through 42-inch sewer; sprayed-in-place pipe (SAPL) pipe lining of approximately 5,840 LF of 60-inch through 66-inch sewer; rehabilitation of approximately 160 VF of manholes with cementitious coating, rehabilitation of approximately 250 VF of manholes with epoxy coating, rehabilitation of approximately 135 VF of manholes with geopolymer spray applied coating, maintenance of traffic; all related excavation, shoring, dewatering, backfill; base and surface pavement replacement related to excavated point repairs; landscaping and restoration of all disturbed surfaces; erosion and sediment control as required; testing; demobilization; permits; and all other work shown on the Contract Drawings and specified in the Contract Documents and as required to complete the Project in its entirety.
Subcontractor Opportunities
Traffic Control
Manhole Inspection
Manhole Rehabilitation
Manhole Bypass
Manhole Flow Control
Manhole Diversion
Chemical Grouting
Excavation
Civil Work
Erosion Control
Landscape / Restoration
Concrete Saw Cutting
Asphalt/Paving
Concrete and Asphalt
Pavement Restoration
Survey
Material Testing
Trucking - Freight
Trucking - Dump Trucks



















