All Information
Company Name:
Archer Western Construction, LLC
Bid Title:
Replacement of Canton Viaduct I-895 over I-95
Bid Due Date:
8/22/17
Bid Due Date Time:
2:00 PM
Project Description:
Archer Western is seeking subcontractors and suppliers for the upcoming MDTA Replacement of Canton Viaduct I-895 over I-95 Project. The project, located in Anne Arundel, Baltimore, and Howard Counties, and Baltimore City, will replace Bridge BCY102001 (I-895 over City streets, I-95 ramps, and active railroads, and crosses under the I-95 Viaduct) and BCY103001 (Holabird Avenue exit ramp over CSXT and Ponca Street) using multiple stages of construction.
The existing roadway beyond the limits of the I-895 bridge will be reconstructed for 620 feet from the north tunnel approach to the south end of BCY102001 and for 180 feet north of BCY102001. The existing pavement beyond the limits of full depth reconstruction will be grinded and resurfaced approximately 1715 feet to the north of BCY102001.
The project includes the replacement of existing retaining walls on the Holabird Avenue Ramp and construction of new retained fill sections at the south end of BCY102001. The project also includes the rehabilitation of the Baltimore Harbor Tunnel, including a new concrete deck overlay inside the tunnel and along the approaches to the tunnel, repairs to the tunnel tile wall, refurnishing of the fire suppression system, replacement of the drainage sump pumps, and repairs to the retaining walls along the approaches to the tunnel. The total project will extend about 2.9 miles, from mile marker 8.80, south of the tunnel, to mile marker 11.65, just north of the Boston Street/Interstate Avenue underpass.
The existing roadway beyond the limits of the I-895 bridge will be reconstructed for 620 feet from the north tunnel approach to the south end of BCY102001 and for 180 feet north of BCY102001. The existing pavement beyond the limits of full depth reconstruction will be grinded and resurfaced approximately 1715 feet to the north of BCY102001.
The project includes the replacement of existing retaining walls on the Holabird Avenue Ramp and construction of new retained fill sections at the south end of BCY102001. The project also includes the rehabilitation of the Baltimore Harbor Tunnel, including a new concrete deck overlay inside the tunnel and along the approaches to the tunnel, repairs to the tunnel tile wall, refurnishing of the fire suppression system, replacement of the drainage sump pumps, and repairs to the retaining walls along the approaches to the tunnel. The total project will extend about 2.9 miles, from mile marker 8.80, south of the tunnel, to mile marker 11.65, just north of the Boston Street/Interstate Avenue underpass.
Posted On:
2017-06-12 09:33:41
Notes:
All quotes are due by August 21, 2017 COB.
For more information, please contact Lavier Shoemaker; 404-495-8700; wshoemaker@walshgroup.com
Fax quotes to: (404) 495-8701 referencing project name and scope of work.
For more information, please contact Lavier Shoemaker; 404-495-8700; wshoemaker@walshgroup.com
Fax quotes to: (404) 495-8701 referencing project name and scope of work.
Contact Information
No Contact yet
Forms And Attachments