All Information
Company Name:
The Whiting-Turner Contracting Company
Bid Title:
D/E Connector & Security Checkpoint at BWI Marshall Airport
Bid Due Date:
11/12/14
Bid Due Date Time:
2:00 PM
Project Description:
The construction of a terminal expansion with approximately 225,000 sf of new construction & renovation of existing construction with the majority of work occurring between Concourse D and Concourse E. The primary components include the widening and renovation of the “throat” portion of Concourse D; the construction of a new D/E Connector with a separate “sterile corridor” to the International Arrivals area in Concourse E; the reconfiguration of two (2) gates that will be capable of servicing either international or domestic flights; and the construction of an eight (8) lane passenger security screening checkpoint.
- Anticipated Construction Schedule: 2/9/15 to 4/6/17
- Davis-Bacon Wage Scale Applies
- MBE/DBE MDOT Contract Goal of 22% Required
- Final Pricing Documents to be issued on 10/17/14
- Site Inspection: 10/22/14 at 10 AM
- Questions Due: 10/29/14 at 10 AM
- Most work will occur on non-secure side of project. Security MAA Red Badge & US Customs Seal will be required for certain work areas.
Bid Number:
MAA-CO-15-005
Posted On:
2014-09-15 10:44:57
Notes:
Drawings, Specifications and Addenda will be available for review via WT FTP site: https://whiting-turner.box.com/s/ibrtf4cfpoavjoxv7ort
Contact Information
Name:
Alex Cardenas
Phone Number:
240-297-1901
Email Address:
alex.cardenas@whiting-turner.com
Forms And Attachments