All Information
Company Name:
Clark Construction Group, LLC
Bid Title:
BWI D/E Connector and Security Checkpoint
Bid Due Date:
11/21/14
Bid Due Date Time:
4:00 PM
Project Description:
This contract will provide construction of a new eight lane passenger security screening checkpoint and airside passenger connector between Concourses D and E at BWI Marshall Airport. The work includes construction of approximately 135,000 SF of new building of three levels and renovation of approximately 90,000 SF within the existing terminal. The project will involve all building trades and specialty work associated with airport terminal facilities. Specific elements of the project include underground utilities, concrete pavement, reinforced concrete and structural steel framing; architectural curtainwall and building envelope systems; one moving walkway and two elevators; air handing units with distribution and piping systems; fire protection systems; plumbing systems; a new electrical substation; telecommunications, data, and security systems; passenger boarding bridges, PC Air and 400 Hz; baggage handling systems.
Posted On:
2014-10-27 12:02:25
Contact Information
Name:
Clark Construction Group, LLC
Phone Number:
301-272-8200
Fax Number:
301-272-1922
Forms And Attachments