This project includes the renovation of the existing Historic Baltimore City College Main Building, existing Annex Building, and a New Addition. The Gsf breakdown is as follows:
Main Building: 302,683 Gsf
Annex Building: 23,568 Gsf
New Addition: 22,979 Gsf
This final package consists of remaining trades listed below; Final Cleaning, Asphalt, Site Concrete, Fences + Gates, Retaining Walls, Landscape Masonry Restoration, Misc. Metals, Millwork, Traffic Coatings, Spray Insulation, Air Barriers, Metal Wall Panels, Caulking, D/F/H, Overhead Coiling Doors, Glass/Glazing, Plaster, Tile, Wood Flooring, Carpet + Resilient, Wall Panels, Painting, Visual display Boards, Specialties, Flagpoles, Signage, Operable Partitions, Kitchen Equipment, Appliances, Athletic Equipment, Kilns, Window Treatments, Fixed Audience Seating, Stadium Seating, Site Furnishings, Swimming Pools, Greenhouse, Elevators, Athletic Surfacing.
The project has an MBE Goal, Workforce Development, is an OCIP Project, and Prevailing Wage; all items can be found through the bid documents.
Site Walks Available; 05/19 and 05/21 from 12-2pm
The Bid Due Date is 06/09 at 2pm










